Bathroom renovation in Dubai.
A bathroom renovation Dubai owners will not repeat in five years — because the waterproofing, falls and ventilation are done properly under the tiling.
The parts that matter are the ones you cannot see
Bathrooms are the most common source of leaks and repeat repairs in Dubai homes, and the reason is almost always the same: tiling laid over old or incomplete waterproofing, or floor falls that never quite reach the drain. Any credible bathroom renovation Dubai scope starts by removing the lot back to the substrate.
Our sequence is fixed — strip out, correct falls, tank the wet zones and the full floor, test, then tile. It adds days, not weeks, and it is the difference between a bathroom that lasts and one that stains the ceiling below within two years.
On top of that, modern bathroom design Dubai comes down to a handful of decisions: how much of the room the shower takes, whether the vanity is wall-hung, tile format, and where the light and the extract go.
What bathroom renovation includes
A full room rebuild, not a resurface.Strip-out
Removal of tiling, sanitaryware, vanities and screens back to substrate, with waste removed as it is generated.
Waterproofing
Liquid membrane to floor and wet-zone walls with correct upstands, corner detailing and a flood test before tiling.
Falls and drainage
Screeds re-laid to fall, drain positions corrected and linear or point drainage set as the layout requires.
Plumbing
Replacement hot and cold supply, concealed cisterns, thermostatic shower valves and accessible isolation points.
Electrical and lighting
IP-rated lighting, mirror lighting and shaver or heated-mirror circuits, with switching outside the wet zone.
Tiling
Large-format porcelain, natural stone or mosaic, set out so cuts land where they are least visible.
Sanitaryware and vanities
WCs, basins, wall-hung or floor-standing vanities, shower systems, screens and hardware.
Ventilation
Extract fans sized for the room and ducted out — the single most effective defence against mould in Dubai.
Bathroom types
Same construction standard, different scope and cost.
Master bathroom
Double vanity, separate walk-in shower and freestanding bath where space allows, often with a dressing area.
Guest and family bathroom
Hard-wearing finishes and practical storage, built for frequent use rather than display.
Wet room / walk-in shower
Fully tanked room with linear drainage and a level or minimal threshold — the strongest option for small bathrooms.
Powder room
Small guest WC where a bold stone, mirror or lighting choice carries the whole room.
Bathroom before and after.
Drag to compare · placeholder pair until project photography is supplied
How a bathroom renovation runs
Survey
Room measured, existing services and drainage located, moisture and leak evidence recorded.
Design and quotation
Layout, tile setting-out, sanitaryware schedule and an itemised written price.
Strip-out and first fix
Full removal, plumbing and electrical first fix, screeds re-laid to fall.
Waterproofing and tiling
Membrane applied, flood tested, then tiling and grouting.
Second fix and handover
Sanitaryware, screens, sealing, testing and a closed snag list.
Photos of the bathroom and a rough floor size are usually enough for an initial estimate.
Who this is for
Bathrooms are the second-most compared room after kitchens — by families, tenants and buyers alike.
Bathroom services in detail
The three parts of a bathroom that most often need doing on their own.Related services
Bathroom renovation across Dubai
Villa and apartment bathrooms citywide.
Bathroom renovation questions.
A single bathroom is usually two to three weeks on site. Waterproofing curing and the flood test account for several of those days and should not be compressed.
Yes. Existing membranes are damaged during strip-out and their condition cannot be verified once tiling is removed. Re-tanking is included in every full bathroom scope.
Usually. It needs the floor build-up re-screeded to fall, new drainage and full re-tanking, which is why it is a rebuild rather than a swap.
In villas often yes. In apartments it depends on the drainage stack — small moves are usually achievable, large ones frequently are not. We confirm at survey before design.
Almost always inadequate extraction combined with high humidity. A correctly sized fan ducted to outside, run on a timer, fixes what repeated repainting does not.
Yes, and it is more efficient — shared setup, one tiling mobilisation and consolidated material orders. We usually phase them so at least one bathroom stays in service.
Book a bathroom survey.
Send photos and the room size on WhatsApp for an initial estimate before the site visit.